https://www.thelandsite.co.uk/articles/update-site-progress-at-our-frampton-cotterell-project
06-11-2020
https://www.thelandsite.co.uk/files/articles/ec6ebc196dab11e99353024b03131eda/141-5fa3fecb49990422257609.jpeg
47
Update: Site Progress at our Frampton Cotterell Project
Posted by Meraki Architecture Ltd on 6th November 2020 -
The detached double garage at our Frampton Cotterell project is developing very nicely with the roof structure now going on.
The main house works however, have ground to a halt as we wait for the steel frame for the back of the house to be manufactured.