The Floorless Steel-framed Bathroom Pods
Posted by EcoReadyBath on 30th August 2022 -
We deliver the steel-framed floorless bathroom pods – a unique pod solution engineered by EcoReadyBath. This advancement in pod technology avoids the need for a recess in the floor slab to minimise floor build-up for each story while achieving continuous level floors.
Architecture and planning: Halliday Fraser Munro
Contractor: Gilbert-Ash
Investor: The Student Hotel
More photos you will find on our website: https://ecoreadybath.uk/portfolio/student-hotel-glasgow/
✉ If you are looking for bathroom pods for your project, please get in touch with US.