https://www.thelandsite.co.uk/articles/site-progress-at-our-frampton-cotterell-project
02-10-2020
https://www.thelandsite.co.uk/files/articles/ec6ebc196dab11e99353024b03131eda/141-5f76de42851dc560514292.jpeg
31
Site Progress at our Frampton Cotterell Project
Posted by Meraki Architecture Ltd on 2nd October 2020 -
The ground floor slab has now been cast at our Frampton Cotterell project.
The blockwork walls will now begin to fly up and the building will start to take some shape.