Level 5 EPC & Reduce Energy Requirements of Your Building
Posted by NRG Focus on 19th September 2020 -
When a building has any form of significant shading then a Level 5 EPC (DSM) model should always be carried out while Level 3 & 4 EPCs use the simple daylighting method, when a building has no significant shading (window and local shading, self-shading and site shading), and when daylight control is not installed or important.
To Find Out Morel Click Here