Extension flies up in Garway
Posted by Meraki Architecture Ltd on 30th September 2020 -
In Garway, construction work is progressing at some serious pace with the ground floor slab cast and the external blockwork cavity walls built up to wall plate level.
With the weather starting to turn it will be crucial to get the roof on and windows and doors fitted to ensure the extension becomes water tight, allowing work to continue inside.